woensdag 8 december 2010

30 years - town centre

The regeneration of the existing town centre will provide a pleasant streetscape and a new town centre hub will be created in the south.















30 years green space

Waterway is a strength for Barking












30 years
The creation of new green space will provide a wealth of ecology, biodiversity, education and leisure facilities for the community to enjoy.
























Masterplan

30 years transport proposal











30 years

New DLR stations will be opened connecting Barking North and South and improving the links to the Central London.






















Videoparts

Historical (Source: Youtube)

Titlepages


For the video

Final crit coming up

This afternoon the final crit will take place. this means that the last week was kind of a hectic one. A lot of work has been done, and our project has entered it's final stage.

Some new things are a new model, some before and afters (will follow later), a new masterplan, and a video (Part of the new storyboard, which was not good enough the last few weeks.)

We hope these efforts will help us, thumbs up!

The Model


woensdag 27 oktober 2010

Update on work

Today, during another class of Urban Development, we had a couple of hours with our group again to work on our project. We managed to finish and start a few parts of what is asked from us, being:
  • Finalised master plan for +30 years
  • Adjusted the model (widened the waterways)
  • Started the storyboard
  • Created Eyesoar-it's
  • Made a bigger model of Mei's painting
  • Brainstorming (part of creating the masterplan)

 
 
More later.

 
Kind regards!

donderdag 21 oktober 2010

model



These are images of our model - showing the new green areas we want to introduce, the new waterways which create leisure, transport and aesthetic qualities to the site.

Interim Crit


This is our conceptual model of what we wanted to focus on in our site.
We dicided to use the pattern set down by the dominating sewage works that are in the south western corner of the site. The treatment pool provide a beautiful pattern on the landscape. However we have decided to move these works and the gas works futther east out of our site.

The words in the centre and the colours all represent ideals and things we would like to include in our design, which will improve the quality of living in the area.
Being that the site is very poor, full of wasteland, industry and council housing the regeneration will improve transport, access tothe river, commercial areas, working areas, new housing, etc

SWOT ANALYSIS POINTS


Historical development of Barking 1870-1980


Present landuse map


Present transport system















Historical transport system(1700)



Transport system development in 30 years'

Transport system development in 30 years'


Google earth transport map


First week presentation

And finally, the photo's of the scans from the first week. Sorry to be a bit late with these.


dinsdag 19 oktober 2010

Painting ( exsiting and proposal)

Exsiting: dark grey means area of factory, yellow means residencial area.





















Proposal: more green and less grey. City and nature in the harmony with each other.

Updates coming up

There will be updates posted on this blog asap.

zaterdag 25 september 2010

Remarks

URBAN DESIGN PROJECT – GREEN TRANSPORT GROUP

FEEDBACK FROM TOM TURNER – 22.09.2010

  1. Green transport = “human-powered” transport
  2. Too much concentration on the river though it is a key element
  3. The problem with river transport is that origins and destinations are rarely beside the river
  4. Add more networks
We are a nation of commuters
We need to look at combining/knitting together working and residential areas

What are the forms of human powered transport
Look at increasing the network of green spaces
Pathway networks
Glazeway networks/Arcades to provide cover and shade
Riding networks
Overlapping of green transport networks

Mass transport
Look at access to stations
Incentivising the use of mass transport/green transport

Combine human transport and mass transport
Schools

Create a network of intersecting nodes

woensdag 22 september 2010

Day 1 - Starting of the Project

Maybe it's good to start with explaining what this blog will be about.

We are students at the University Of Greenwich, doing our MA of Landscape architecture. This blog will contain photo's, texts and explanations about a project we were assigned to do, being the 'Urban Development Project.' It's located in London, and we have to look at the current situation, the situation 300 years ago, what the situation might be like in 30 years, and the same for 300 years.

Today, we were divided into groups, and each group got their own theme assigned. Our theme was 'Green Traffic.' So we started brainstorming about how we could interpret the meaning of Green Traffic, and came up with different idea's. We thought about the different possibility's that were possible for the development, and how they could be implemented.

We had to present the work we had made, and after that we got hints and tips about what we had done. We had paid too much attention to the area around the Thames, and not enough attention to Cycling. Something we will certainly pay more attention to in further developents of our project.

(Photo's will follow)


With kind regards,
Lisa Vandepeer, Samuel Gall, Jo Boonen, Mei Xue and Kate Dixon